News From Multiple Perspectives

Parts of Maju Forest to make way for public housing

Published July 11, 2026 at 10:33 PM UTC

Authored by
Every article published on DirectionFreeNews undergoes editorial review by our editorial team. Our editors research publicly available information from multiple trusted news organizations, compare differing perspectives, verify key facts, and publish balanced summaries intended to help readers better understand important events. Our editorial process is designed to reduce editorial bias by considering multiple reputable sources rather than relying on a single viewpoint

The Housing and Development Board (HDB) announced on July 10, 2026, that approximately 15 hectares of the 23-hectare Maju Forest in Clementi will be redeveloped for new public housing. This greenfield site, which has been zoned for residential use since 1980, is set to help meet Singapore's ongoing demand for homes. To balance development with environmental needs, HDB plans to retain about 8 hectares of the forest, specifically areas containing a natural freshwater stream and high-biodiversity vegetation.

Environmental studies conducted for the site identified 113 fauna species, including six of conservation significance such as the straw-headed bulbul and the buffy fish-owl. To mitigate the impact on these species, HDB intends to implement phased site clearance, allowing wildlife to relocate to adjacent green spaces before construction begins. Additionally, the agency plans to salvage plants of conservation significance where feasible.

Connectivity remains a key focus of the development plan. The retained forest area will serve as a refuge for wildlife, and the project includes the potential development of a 4-kilometer nature trail around the Old Jurong Railway Line. This trail, along with a planned 2-kilometer Clementi Nature Trail, aims to maintain ecological links between surrounding forest patches.

Nature groups were engaged throughout the planning process, and HDB has indicated that public feedback will continue to inform the final housing yield, mix, and development timeline. As the project moves forward, the agency will monitor the site to ensure that the ecological measures, such as native replanting and wildlife protection, are effectively managed during the construction phases.